- Installation of 10 Freyssinet 1×15 external prestressing anchorages
- Supply and installation of 1,100 m of greased and sheathed Ø15.7 mm galvanised strands (279 kN minimum breaking load)
- Installation of 1,100 m of HDPE duct
- Full tendon grouting and stressing using monostrand jacks
- Greasing of all anchorages to provide long‑term corrosion protection
- Surface preparation including levelling and smoothing of tank surfaces prior to installation
- Works completed safely, on time, and within budget