The Longburn Rail Overbridge on State Highway 56 required structural strengthening to increase its load‑carrying capacity for High Productivity Motor Vehicles (HPMVs). To achieve the required performance upgrade, an external post‑tensioning solution was selected using Freyssinet’s proprietary 1R15 anchorage system. This system is specifically designed for reinforced concrete structures—particularly thin elements—where additional prestressing is needed without major reconstruction. The strengthening involved installing external strands along the concrete girders, deviated at points of contraflexure and anchored at the girder supports, allowing the prestressing force to be efficiently transferred into the structure.

  • Customer/Owner:
    NZTA
  • Engineer
    WSP Opus
  • Works period
    May 2018- May2018

Freyssinet Scope

  • Installation of 12 Freyssinet 1R15 external post tensioning anchorages
  • Supply and installation of 74 m of greased and sheathed Ø15.7 mm prestressing strand (279 kN minimum breaking load)
  • Installation of 6 × 0.6 m long Ø26.5 mm Freyssibars with nuts and washers
  • Installation of 3 steel deviators at midspan
  • Completion of finishing works including greasing of anchorages; Installation of heat shrink sleeves and touch up protective paint