Fonterra Co‑operative Group, New Zealand’s largest company and one of the world’s leading dairy exporters, required structural remediation after newly created slab penetrations resulted in cut reinforcement within a key operational facility. To restore the slab’s structural performance without disrupting site operations, a high‑performance strengthening solution was required—one that could be installed efficiently and with minimal impact on the existing structure.

  • Customer/Owner:
    Fonterra
  • Engineer
    RAC Specialist Structural Consulting
  • Works period
    July 2023 - September 2023

Freyssinet Scope

  • Design‑and‑build strengthening approach using Carbon Fibre Reinforced Polymer (CFRP)
  • Installation of up to 7 layers of CFRP fabric per location
  • Use of fiocco anchors, with up to 6 bundles per FRP anchor
  • Strengthening applied across 8 slab locations
  • Total installation of 108 m² of CFRP fabric
  • Installation of 270 metres of fiocco anchor fabric