- Specialist contractor responsible for full incremental launch methodology
- Design of all temporary works for the bridge launch
- Supply of specialist equipment including pumps, hydraulic jacks, and stressing systems
- Supply of materials including Freyssibars, PTFE sliding pads, and strands
- Execution of stressing works for the launch nose, rocker bearings, and side guides
- Development and delivery of detailed construction methodologies
- On‑site technical assistance throughout the launch operations