- Installed FRP strengthening systems on floors at Levels 2–6 and around basement columns
- Supplied and installed Freyssinet 1r15 anchorages for transverse stressing across four grids at Level 5
- Delivered H1000 multistrand system for the gridline requiring enhanced load capacity